This topic explains how to prepare the site, install, connect, power on, and check the switch.
This chapter describes the installation procedures for the switch.
Switch installation involves the steps described in the following sections:
- Step 1: Prepare the Site
- Step 2: Protect Against Electrostatic Discharge
- Step 3: Unpack the Switch
- Step 4: Install the Switch
- Step 5: Connect PoE and Non-PoE Devices to the Switch
- Step 6: Install SFP or QSFP Transceiver Modules
- Step 7: Install a Power Supply Unit
- Step 8: Check the Installation Before You Apply Power
- Step 9: Apply AC Power and Check the LEDs
- Optional Step 10: Connect a Console to the Switch