Step 3: Unpack the Switch

This topic explains how to check the package contents and unpack the switch.

The following figure shows the package contents for the switch.

Figure 1. Package contents


Check the contents of the boxes to make sure that all items are present before installing the switch.

To check the package contents:

  1. Place the container on a clean flat surface, and cut all straps securing the container.
  2. Unpack the hardware from the boxes by carefully removing the hardware and placing it on a secure and clean surface.
  3. Remove all packing material.
  4. Verify that the package contains the following items:
    1. Switch model M4300-96X (The previous figure shows the chassis without port cards and blank covers.)
    2. USB console cable with one mini B connector and one type A connector
    3. Power cord for the PSU
    4. Console cable with one DB9 connector and one RJ-45 connector
    5. Rack-mounting screws
    6. Rear rack-mounting brackets with rails
    7. Front rack-mounting brackets
    8. Rubber footpads for tabletop installation
    9. Installation guide
    10. Rubber caps to protect unused RJ-45 ports and SFP+ ports
  5. If any item is missing or damaged, contact your local NETGEAR reseller for replacement.