Step 1: Prepare the Site

This topic lists site requirements for mounting, access, power, cabling, and environment.

We recommend that you install the switch at a location where access is restricted to qualified service personnel only.

Before you install the switch, make sure that the operating environment meets the site requirements that are listed in the following table.

Table 1. Site requirements
Characteristics Requirements
Mounting

Rack-mount installations. Use a 19-inch (48.3-centimeter) EIA standard equipment rack that is grounded and physically secure. You also need the rack-mount kit that is supplied with the switch.

Desktop installations. Provide a flat table or shelf surface.

Access Locate the switch in a position that allows you to access the front panel slots, view the front panel system LEDs, and access the PSU bays and ports on the back panel.
Power source Use the AC power cord that is supplied with the switch. Make sure that the AC outlet is not controlled by a wall switch, which can accidentally turn off power to the outlet and the switch.
Cabling Route cables to avoid sources of electrical noise such as radio transmitters, broadcast amplifiers, power lines, and fluorescent lighting fixtures.
Environmental

Temperature. Install the switch in a dry area with an ambient temperature between 0ºC and 50ºC (32ºF and 122ºF). Keep the switch away from heat sources such as direct sunlight, warm-air exhausts, hot-air vents, and heaters.

Operating humidity. The maximum relative humidity of the installation location must not exceed 90%, noncondensing.

Ventilation. Do not restrict airflow by covering or obstructing air inlets on the sides of the switch. Keep at least 2 inches (5.08 centimeters) free on all sides for cooling. The room or wiring closet in which you install the switch must provide adequate airflow.

Operating conditions. Keep the switch at least 6 feet (1.83 meters) away from the nearest source of electromagnetic noise, such as a photocopy machine.