Installation
This chapter describes the installation procedures for the switch.
Switch installation involves the steps described in the following sections:
- Step 1: Prepare the site
- Step 2: Protect Against Electrostatic Discharge
- Step 3: Unpack the Switch
- Step 4: Install the Switch
- Optional Step 6: Install SFP Transceiver Modules
- Optional Step 8: Install a Second Power Supply Unit
- Optional Step 9: Connect a Redundant Power Supply
- Step 5: Check the Installation
- Step 7: Apply AC Power and Check the LEDs
- Optional Step 10: Connect a Console to the Switch