Step 1. Set up the switch

Prepare the installation site so that mounting, access, power source, and environmental requirements are met.

Note: For more information about these requirements, the hardware setup process, the LEDs, and how to connect devices, see the hardware installation guide, which you can download by visiting https://www.netgear.com/support/enterprise.
  1. Install the switch using one of the following methods:
    • On a flat surface: Attach one of the rubber footpads that came with the switch on each of the four concave spaces on the bottom of the switch.
    • In a rack: Except for desktop models, use the rack-mount kit that is supplied with your switch.
    • Attached to a flat surface or under a table: For desktop models only, use the brackets that are supplied with your switch.
  2. Apply power.
    The Power LED lights solid yellow while the switch conducts a power-on self test (POST). After the POST completes, the Power LED indicates the results:
    • Solid green: The switch is functional.
    • Solid yellow: The POST failed. For more information, see the hardware installation guide.
  3. Connect devices to the switch.
    We recommend using the following cables:
    • Category 5e (Cat 5e) or higher-rated cable for a copper port at 1 Gbps or 2.5 Gbps.

    If applicable to your network, we recommend using the following SFP modules:

    • NETGEAR AGM734 module for a copper port at 1 Gbps.
    • NETGEAR AGM731F or AGM732F module for a fiber port at 1 Gbps.
    • NETGEAR AXM761, AXM762, AXM763, or AXM764 module for a fiber port at 10 Gbps.
    • NETGEAR AXC761 (1 m), AXC763 (3 m), AXC765 (5 m), AXC767 (7 m), AXC7610 (10 m), AXC7615 (15 m), AXC7620 (20 m) DAC cable for a fiber port.
Note: If purchased, SFP modules and cables are shipped separately.
Warning: Before connecting this switch to outdoor cables or devices, see kb.netgear.com/000057103 for safety and warranty information.