Configure the Restart Wizard

Use the Restart Wizard to select switches and ports, choose a restart mode, and power cycle PoE ports from the controller.

Use the Restart Wizard to select switches and ports, choose a restart mode, and power cycle PoE ports from the controller.

To configure the restart wizard:

  1. On your computer, in the folder in which you installed the controller application, double-click the Engage application icon, or double-click the Engage shortcut.

    The controller application opens and displays a login page.

  2. In the Login Name field, enter admin as the user name, in the Password field, enter the controller password that you set up the first time that you logged in, and click the Login button.

    The Managed Devices page displays.

  3. If you set up more than one site, from the Site menu, select the site.

    The Edit Network Setup pop-up window displays.

    Do one of the following:

    • Make no changes to the network setup for the site: Click the Apply button.
    • Change the network setup for the site: See the information in Edit the network setup of a site. When you are done, click the Apply button.

    The Managed Devices page adjusts.

  4. Select Site Settings > PoE > Restart Wizard.
    The Restart Wizard page displays.
  5. In the Select Switch tab, select the check box next to each switch you want to restart ports on.
    You can select one or more switches.
  6. Click the Next button.
    This button is deactivated until you select at least one switch.
  7. On the Select Ports tab, select the individual ports to restart for each listed switch.
    Ports are grouped by switch. Select the Select All check box next to a switch name to select every port on that switch. The Selected Ports counter next to each switch name updates as you choose ports.
  8. Click the Next button.
    This button is deactivated until you select at least one port.
  9. In the Configure & Restart tab, review the warning that restarting PoE ports temporarily disconnects power to connected devices and might cause a brief service interruption.
  10. In the Port Restart section, select a restart mode:
    Option Description
    Simultaneous (Fast Restart) Restarts all selected ports at the same time. This mode is faster, but might cause higher network load during power-up.
    Sequential (Gradual Restart) Restarts ports one at a time. This mode is safer and reduces network load during power-up.
  11. From the Port Downtime (Seconds) menu, select the amount of time PoE power remains off before it is restores.
    The default value is 10 seconds.
  12. Click the Restart button.
    Use the Previous button at any point before this step to return and change your switch, port, or configuration selections without losing them.
  13. Wait for the restart to complete.
    The Restart In Progress screen displays the switch name, number of ports, and live status (for example, Restarting (0/1)) while the selected ports are power cycled.
  14. Review the result, then click the Done button.
    The Restart Completed screen confirms whether the selected ports were restarted successfully and shows the completed status count (for example, Completed (1/1)) for each switch.
  15. Click the Cancel button to discard changes.
  16. To save the settings to the running configuration, at the top right of the page, click the Save button.

The selected PoE ports are power cycled according to the configured restart mode and downtime, and the wizard reports success, partial success, or failure for each switch.