Create a PoE Schedule

Create a PoE schedule in Engage to automatically power on, power off, or restart PoE on selected switch ports at a defined recurrence and date range.

PoE schedules let you automate power actions across switch ports at your site without manual intervention. You can apply a schedule to all switches at the site at once, or target specific switches and ports. Each schedule runs at a defined recurrence, daily, weekly, or monthly, within a start and end date range that you specify.

  1. On your computer, in the folder in which you installed the controller application, double-click the Engage application icon, or double-click the Engage shortcut.

    The controller application opens and displays a login page.

  2. In the Login Name field, enter admin as the user name, in the Password field, enter the controller password that you set up the first time that you logged in, and click the Login button.

    The Managed Devices page displays.

  3. If you set up more than one site, from the Site menu, select the site.

    The Edit Network Setup pop-up window displays.

    Do one of the following:

    • Make no changes to the network setup for the site: Click the Apply button.
    • Change the network setup for the site: See the information in Edit the network setup of a site. When you are done, click the Apply button.

    The Managed Devices page adjusts.

  4. Select Site Settings > PoE > Schedule > Create Schedule.
    The Create Schedule pop-up window displays.
  5. Do one of the following:
    • To apply the schedule to every PoE switch at the site, activate the All Switches from this site toggle so that it is positioned to the right.
    • To apply the schedule to an individual switch, deactivate the All Switches from this site toggle so that it is positioned to the left and from the Switch menu, select a specific switch.
  6. In the Schedule Name field, enter a name for the schedule.
  7. If you configure the schedule to an individual switch only, in the Selected Ports area, select the ports you want the schedule to apply to, or select the Select All check box to include all ports on the selected switch.
  8. In the Action section, select the PoE action to perform at the scheduled time:
    Option Description
    Power On Enables PoE on the selected ports at the scheduled time.
    Power Off Disables PoE on the selected ports at the scheduled time.
    Restart Cycles PoE off and back on for the selected ports at the scheduled time.
  9. In the Recurrence section, select the frequency of the schedule: Daily, Weekly, or Monthly.
  10. Set a Start Date and End Date to define the period during which the schedule is active.
  11. If you selected Restart in 6, in the Fire Time field, set a time for the switch or switches to restart.
  12. In the Port Behavior section, choose a Port Behavior:
    Option Description
    Simultaneous (Fast Restart) All selected ports restart at the same time. This is faster but may cause higher network load during power-up.
    Sequential (Gradual Restart) Restarts ports one at a time. This is safer and reduces network load during power-up.
  13. If you selected Restart in 6, from the Port Downtime menu, select a length of downtime for a port in seconds.
  14. Click Create to save the schedule, or click the Cancel button to discard it.
  15. To save the settings to the running configuration, at the top right of the page, click the Save button.