Step 1: Prepare the site
Before you install the switch, make sure that the operating environment meets the site requirements that are listed in the following table.
|
Characteristics |
Requirements |
|---|---|
|
Mounting |
Desktop installations: Provide a flat table or shelf surface. Rack-mount installations: Use a 19 in. (48.26 cm) EIA standard equipment rack that is grounded and physically secure. You also need the rack-mount kit that is supplied with the switch. |
|
Access |
Locate the switch in a position that allows you to access the front panel ports, view the front panel LEDs, and access the power connector on the back panel. |
|
Power source |
Use the AC power cord that is supplied with the switch. Make sure that the AC outlet is not controlled by a wall switch, which can accidentally turn off power to the outlet and the switch. |
|
Cabling |
Route cables to avoid sources of electrical noise such as radio transmitters, broadcast amplifiers, power lines, and fluorescent lighting fixtures. |
|
Environmental |
Temperature: Install the switch in a dry area with an ambient temperature between 32ºF and 122ºF (0ºC and 50ºC). Keep the switch away from heat sources such as direct sunlight, warm-air exhausts, hot-air vents, and heaters. Operating humidity: The maximum relative humidity of the installation location must not exceed 90 percent, noncondensing. Ventilation: Do not restrict airflow by covering or obstructing air inlets on the sides of the switch. Keep at least 2 in. (5.08 cm) free on all sides for cooling. The room or wiring closet in which you install the switch must provide adequate airflow. Operating conditions: Keep the switch at least 6 ft (1.83 m) away from the nearest source of electromagnetic noise, such as a photocopy machine. |