Step 3: Unpack the switch

The following figure shows the package contents for the switch.

Figure 1. Switch package contents


Check the contents of the boxes to make sure that all items are present before installing the switch.

To check the package contents:

  1. Place the container on a clean flat surface, and cut all straps securing the container.
  2. Unpack the hardware from the boxes by carefully removing the hardware and placing it on a secure and clean surface.
  3. Remove all packing material.
  4. Verify that the package contains the following items:
    Letter Description
    a Switch (in the previous figure, model GS724TPv2 is shown)
    b Power cord
    c Rubber footpads for tabletop installation
    d Rubber protection caps, which are already installed in the SFP sockets. If you install an SFP transceiver module, you must remove the cap from the SFP socket.
    e Screws for rack mounting
    f Brackets for rack mounting
    g Installation guide
  5. If any item is missing or damaged, contact your local NETGEAR reseller for replacement.