Step 3: Unpack the Switch

The following figure shows the package contents for the GS510TLP. The package contents for the GS510TPP are the same.
Figure 1. Switch package contents

Check the contents of the boxes to make sure that all items are present before installing the switch.

To check the package contents:

  1. Place the container on a clean flat surface, and cut all straps securing the container.
  2. Unpack the hardware from the boxes by carefully removing the hardware and placing it on a secure and clean surface.
  3. Remove all packing material.
  4. Verify that the package contains the following items:
    • Switch of the correct model
    • Power cord
    • Rack-mounting kit
    • Rubber footpads for tabletop installation
    • Quick installation guide
  5. If any item is missing or damaged, contact your local NETGEAR reseller for replacement.