Step 7: Check the installation

Before you apply power to the switch, perform the following steps.

To check the installation:

  1. Inspect the equipment thoroughly.
  2. Verify that all cables are installed correctly.
  3. Check cable routing to make sure that cables are not damaged or creating a safety hazard.
  4. Make sure that all equipment is mounted properly and securely.