Step 3: Unpack the switch

Check the contents of the boxes to make sure that all items are present before installing the switch.

To check the package contents:

  1. Place the container on a clean flat surface, and cut all straps securing the container.
  2. Unpack the hardware from the boxes by carefully removing the hardware and placing it on a secure and clean surface.
  3. Remove all packing material.
  4. Verify that the package contains the following items:
    • Model GS108Tv3:
      • Switch model GS108Tv3
      • DC power adapter (varies by region)
      • Wall-mount kit
      • Four rubber footpads
      • Installation guide
    • Models GS110TPv3 and GS110TPP:
      • Switch model GS110TPv3 or model GS110TPP
      • DC power adapter with a detachable power cable (varies by region)
      • Wall-mount kit
      • Four rubber footpads
      • Installation guide
  5. If any item is missing or damaged, contact your local NETGEAR reseller for replacement.